Koehler Electric designed the entire electrical system for the new Genesis Systems Group plant located near the Davenport Airport.

Preliminary budgets were developed by Koehler Electric and then finalized after adjustments based on the overall project cost restraints.

Complete Turnkey Services

Koehler Electric utilized in-house CADD operations to create the site and floor plan electrical drawings. Complete installation of the electrical system included:


  • Site utilities - primary, secondary & telephone
  • Lighting - building, security, sidewalk, parking lot & signage
  • 480v distribution for all standard power & "k" rated power requirements for harmonics
  • 480v distribution & control wiring for rooftop fans & sidewall louvers
  • Computer power distribution to each workstation with separate neutral and ground
  • 480v distribution and low voltage control for office HVAC & zone dampers
  • 900 feet of 480v bus duct was installed for power drop connections to robots & equipment cabinets
  • Underground trenching for installation of parking lot lighting
  • Data & Communications System


Koehler Cabling, a division of Koehler Electric, installed a Lucent Technologies SYSTIMAX data and communications system in the new facility. Fiber optic and 200 pair telephone backbones were installed with connections to numerous stations throughout the facility.