Electric was the prime contractor on this project "from the
ground up." Installation of this generator backup system presented
an unusual challenge. The existing system required modification
and connection to the backup system while in operation.
Complete installation
of the system included:
Construction of new generator building
Remodel of existing facility
3 new 1 meg generators
Synchronization panel
Switchgear
Busway
Transfer switches
"Koehler Electric's assigned personnel were very professional
and responsive. They performed quality work and demonstrated
thorough planning. It was a complex project successfully completed
within budget."
R. Fred Stevenson, P.E.
Staff Engineer
Deere & Company