Koehler Electric was the prime contractor on this project "from the ground up." Installation of this generator backup system presented an unusual challenge. The existing system required modification and connection to the backup system while in operation.

Complete installation of the system included:

  • Construction of new generator building
  • Remodel of existing facility
  • 3 new 1 meg generators
  • Synchronization panel
  • Switchgear
  • Busway
  • Transfer switches


"Koehler Electric's assigned personnel were very professional and responsive. They performed quality work and demonstrated thorough planning. It was a complex project successfully completed within budget."