Koehler
Electric worked closely with Alcoa from design through start-up
and commissioning of the Litho Processing Line.
Complete electrical
installation of the Line included:
Embedded conduits
Cable trays and support steel
Control houses
HVAC control system
Conduit and wire
Terminations
Accuracy was critical , but the project was on a very short
time-line. Koehler Electric utilized innovative field practices
and craft expertise to save both time and money and completed
the project in a world class time frame of eighteen months.